
The new concrete bridge allows crews to begin dismantling the old wooden bridge. Crews will also work on a parallel bridge that will hold the second set of tracks.
来源:KPBS
阅读原文:https://www.kpbs.org/news/environment/2026/11/09/trains-shift-to-new-concrete-bridge-at-batiquitos-lagoon-replacing-1940s-wooden-trestle